tel 0571-89175788
Product
0571-89175788
Tel£º18968054799
Fax£º0571-89175775
Q Q£º2750271490
E-mail£ºhzjinlang@126.com
Location£ºHome > Product > Introduction and update > Development History
Development History

 

>The Fourth generation models

Integrated 6 years of customer feedback recommendations, absorbing the first three models of all the advantages.

Set as people shuangdiao machine 6 years of manufacturing experience and wisdom in a.

The performance is super stable, smaller, faster and easier to operate...

Mass production in 2006 October.

>The Third generation models

The model fully absorbed the advantages of the previous two models, and integrated a large number of customer feedback recommendations.

"Take its essence, discard its dross", every detail embodies the wisdom of the creative staff. Mass production in 2004 June.

At present, including Baocheng group Yu Yuan mold factory, mold factory Yusheng that customers are experiencing a tailor-made for the shoe mold factory shoes mold machine brings convenience and fast. It has been discontinued

>The Second generation models

An improved model for the first generation models. The defects of the uncomfortable man-machine interface in the first generation model were corrected.

The model began mass production in July 2002.

At present, widely serving the Pearl River Delta region, Fujian Province, Zhejiang province customer base. It has been discontinued

>The First generation models

The first double head shoe machine. Completed customer acceptance in March 2001.

Marks the "left and right feet simultaneously processing" this idea through the practice of testing.

Marks the birth of the double head shoe machine. It has been discontinued